Tuscan Update

Well, things are moving on with the Tuscan. The engine and gear box are firmly in place with the prop, diff and driveshafts all bolted up.

The car had a short holiday in brackley and came back with some nice ( and expensive) and shiney bits of pipe work connecting the Zertec Headers to the Original AJP side exhaust.

Then It Headed off to Pace Products for a new oil pump after we decided our original one was too big to fit!!. Pace also made a custom drive wheel and bracket to get everything in the right place and bolted everything onto the car,

The Remaining Jobs are plumbing in the oil and water pipes with the help of www.motorsport-plumbing.co.uk, which should happen this week.

after that its just the engine bay wiring and its time for testing.

With the first race now Brands Hatch on April 16th we have a little bit more time to play with.

its taken much longer than we had planned to get the car ready but then we hadnt planned to move house in the middle of the Build!!!